Ultra-fast charging blocked by infrastructure limits?
February 07, 2026
Ultra-fast charging blocked by infrastructure limits?
Many CPOs face the same challenges:
1️⃣ Weak-grid or off-grid sites where fast charging isn’t possible
2️⃣ 2–3 year wait for grid connection or transformer upgrade
3️⃣ Limited space and shortage of skilled installation team
4️⃣ Heavy on-site construction and long commissioning cycle
5️⃣ Complex debugging across charging, battery storage and PV system from multiple OEMs
Our 400kW / 350kWh all-in-one battery storage DC charging solution removes these barriers—enabling high-power charging ( #HPC) everywhere and without delays, downtime, or costly infrastructure upgrades.
By decoupling HPC from grid constraints, it delivers:
✅ Reliable 400kW rapid charging with limited or no grid connection
✅ Pre-built deployment with minimal on-site civil work
✅ Fully integrated charging + storage + PV access (opt.)
✅ Peak shaving and backup power support
✅ Flexible dispenser installation: floor-standing or overhead
Whether you’re operating in remote areas, at temporary sites, or in
regions with limited grid or transformer capacity, this 400kW / 350kWh delivers fast and reliable charging to keep your site
powered at all times.
Discover more at www.infypower.com.
#Infypower #batterystorageEVcharging #HighPowerCharging #WeakGrid #GridConstraints #EnergyResilience #eMobility